Punching
You are here : Homepage Cutting Machines Punching Company: PiranhaCompany details | ||
Name : | Piranha | |
Country : | United States |
Piranha: Since 1974, we have been producing the Piranha ironworker – long recognized as the metal fabrication industry’s Number One brand.
Bertsch: Bertsch was founded in 1879, and has earned worldwide recognition as the leader in the manufacturing of innovative, heavy-duty metal rolling equipment. Bertsch has been a Piranha brand since 2003.
W.A. Whitney: W.A. Whitney was founded in 1907, and is a leader in the design and manufacture of laser, plasma, and plasma/punching combination technology for metal plate fabricators. W.A. Whitney has been a Piranha brand since 2004.
Products | About the Company |
Ironworkers Plasma Tables Combination Punch Plasma Fiber Laser Press Brakes Shears Bending Rolls Single End Punch Portable Presses Cnc Fabricators |
Piranha is the combination of three legendary brands dating back to the 1800’s; Piranha, W.A. Whitney, and Bertsch. |
Contact information | |
Website : | Click to See Website. https://piranhafab.com |
Email : | Click to See Email. [email protected] |
Tel : | 800-338-5471 , Fax: 815-964-3175 |
Address : | Piranha 650 Race St. • P.O. Box 1206 Rockford IL 61105, USA |
Other Manufactures
Commercial Points for punching machine
- Do we have to negotiate with the supplier commercial affairs and technical affairs simultaneously?
- Why do we have start negotiating technical affairs first?
- Why should the customers need to inform Punching machine suppliers of their working environment?
- How much is the standard volume of sound produced by the punching machines?
- What technical documents do you need to get from supplier?
- What are Commercial affairs for punching machines?
- What is Incoterms?
- What is delay penalty in delivery?
- What are commercial and technical documents?
- Can customer choose the color of Punching Machine?
- What is acceptance?
- What are main technical parameters of tube bending Machines?
- What is final Acceptance?
We strongly recommend you to start negotiating technical affairs first (if offer and quotation is reasonable to you). Clear all vague points in technical affair and then start negotiating commercial affairs.
When you change items and options, price, delivery time and terms may get changed.
We know that working environment could effect on outputs (tolerances) and even on machines. Working environment includes cold, warm, hot, dry, humidity, clean and dusty. For example, if your factory is located in very cold climate, the supplier has to use heating system in hydraulic tanks or special rubber seal in some parts of punching machine
The Standard volume is 75 Decibel for all working mental machines but for punching machines is 50 or 60 Decibel.
You need to get electrical drawings, hydraulic drawings, maintenance manual, potential errors and list of wear parts.
Price, Payment Terms, Delivery Time, Packing, Guaranty, Warranty, Per acceptance, Final Acceptance, Delay Penalty, Inco Terms and Documents.
The Incoterms are a series of pre-defined commercial terms published by the International Chamber of Commerce defining, obligations, costs and risks of the delivery of goods. Ex-works, FOB, CFR, CPT, CIF are some of them.
In case you mention delay penalty in your agreement –signed by supplier and customer, you could clam penalty and deduct the amount of penalty as agreed in final payment.
There are two kinds of documents. commercial documents and technical documents. P/I, Invoice, Certificate of Origin, packing list, inspection if the machine has been inspected, manual and drawings including electrical drawings, pneumatic drawings, wear parts drawings.
The customers have right to select the color of the machine. The customers have to inform the supplier the RAL colors.
When supplier finishes manufacturing the punching machine in their factory, they have to announce it to the customer. It would be better that customer attend in suppliers’ factory for two reasons. One: testing or checking all requested parameters. Two: training, maintenance training. This acceptance is mostly called Pre-acceptance.
Accuracy , speed, power , tube feeding system, components brands, NC or CNC , rotary head.
Some customers request suppliers to set off experts to customer’s factory to install and run the machines in factory. Manufactures’ experts have to assemble and setup the machine and then run the machine for two or three shifts. If any problems occurred –after setup- final acceptance is Ok.